How we work

Precision is the product.

Whether we are analysing a year of alarms, reviewing a controller program, verifying a trip against its cause-and-effect matrix or commissioning a loop, the method is the same: check the work against a source of truth, prove it rather than sample it, and hand you evidence your engineers can check. An opinion can’t be audited. A calculation can.

The rules we hold ourselves to

The same seven rules on every job, whatever the discipline.

What precise means, discipline by discipline

Each discipline has its own source of truth and its own way of proving the work.

DisciplineChecked againstHow we prove itWhat you receive
Alarm managementISA-18.2, IEC 62682 and EEMUA 191 performance targets; your historian recordValidated analytical methods, statistical before-and-after testing, reproducible runsKPI audit, cascade maps, suppression rules in DCS import format, PID parameters
Control logicControl narratives, I/O lists, alarm documentation and your coding standardsEvery routine read; configured versus documented compared line by lineRanked findings with fixes, standardized libraries, narratives rebuilt from the code
Cause and effectThe cause-and-effect matrix and design intentMathematical checks of every interlock; scan-by-scan execution; equivalence proofsConflicts in plain language: masked causes, redundant cells, overridable trips
Safety instrumented systemsIEC 61511 lifecycle, safety requirements and the C&ESIS logic checked against requirements; voting reviewed for common-cause failureFindings tied to the requirement they break, bypass and override review
Documentation and fieldWhat is actually installed and runningDocuments generated from the code and tag register, then loop-checked in the fieldNarratives, C&E matrices and loop folders that match the plant; commissioning support

Standards, clause by clause

Every finding cites the clause it answers to, so your reviewers can check the reasoning against the standard itself.

ISA-18.2-2016
Alarm system lifecycle, KPIs and targets, rationalization, MOC and audit.
IEC 62682:2022
The international alarm management standard, harmonised with ISA-18.2.
EEMUA 191 (2024)
Alarm system performance grading and human-factors guidance, 4th edition.
API RP 1167
Pipeline SCADA alarm management under 49 CFR 192 and 195.
IEC 61511 / ISA-84
Safety instrumented systems for the process industries.
IEC 61508
Functional safety of electrical and programmable safety-related systems.
IEC 61131-3
PLC programming languages: ladder, function block and Structured Text.
OSHA PSM
Deliverables structured as evidence for 29 CFR 1910.119 process safety management.
FoxIQ Research

What the published papers don’t tell you

Research in alarm management, control and functional safety is published faster than anyone checks it. A method that looks decisive in a paper often depends on a clean dataset, a tuned threshold or an assumption stated in a footnote.

We take published methods, re-run them on real plant data with the same discipline we apply to client work, and publish the result: whether it reproduces, what it assumes, and where it breaks.

Built by people who commission plants

FoxIQ’s engineering comes from the field: commissioning instrumentation, control and safety instrumented systems on offshore and onshore oil and gas projects, writing corporate control standards for Rockwell platforms, and research on common cause failure in redundant safety voting systems.

That is why every deliverable is something an engineer can act on: a change package for MOC, a ranked finding with its fix, a narrative that matches the code, a loop folder that matches the installation.

When the work moves from analysis to hardware, Red Fox Automation, our field services arm, handles integration, panel fabrication and commissioning. One team, from the first export to the loop check.

Check our work. Then send us yours.

Talk to an engineer