FoxALM

Alarm management with the evidence attached.

A rationalization workshop gives you opinions and a report. FoxALM reads three to twelve months of your alarm history and gives you changes your engineers can implement, each one backed by the analysis that justifies it and verified after it goes in.

You send
Three to twelve months of alarm and event history
Turnaround
Five business days
Site visit
None for the baseline assessment
You receive
A change package in your DCS vendor’s import format
Coverage
29 of 30 ISA-18.2 / IEC 62682 measurable requirements in full, the 30th in part
Beyond
17 capability areas neither standard requires
Standards
ISA-18.2-2016, IEC 62682:2022, EEMUA 191 (2024), API RP 1167

What you send

One export. No network connection to your plant, and no one from FoxIQ on site for the baseline.

Three to twelve months of alarm and event history

A standard export from your historian or DCS. Three months is enough to start. Twelve captures seasonal operation, turnarounds and the rare upsets that matter most, so send as much as you have.

  • OSIsoft PI
  • Emerson DeltaV
  • Honeywell Experion
  • CSV export

Sent through our client files area

Each client gets its own access-controlled upload area. Files are encrypted at rest and deleted automatically after the retention period you choose. We sign your NDA before any data changes hands, and confirm in writing when your files are deleted.

What you get back, within five business days

An engineering change package. Every item states what to change, why, and how confident the analysis is.

Floods, traced to the first alarm

During an upset one event sets off dozens of alarms. The cascade map shows which one started it and which follow from it, so suppression targets the consequences and the operator sees the cause.

Initiating alarm
FIC-901 LOW
Cooling water flow low
Consequences, suppressed while the root is active
  • TIC-303 HIGHKerosene draw temperature
  • TIC-304 HIGHDiesel draw temperature
  • TIC-1001 HIGHFurnace outlet temperature
  • P-401 HIGHBottoms pump vibration
Example from a FoxALM test dataset for a crude unit: a loss of cooling water upsets the heat balance and propagates to the draws, the furnace and the bottoms pump. Real maps name your tags.

Proven on real offshore wells

Field data from offshore oil wells, one sample per second, every event labelled by experts. Checks written from those labels before any run.

42 / 42checks passed10well event classes30end-to-end runs

Three ways to engage

Questions engineers ask

How much history do you need?

Three months is enough for a baseline assessment. Up to twelve months captures seasonal swings, turnarounds and rare upsets, so the more you can send, the more the analysis can see.

Do you need access to our network?

No. You send an export through our client files area. We never connect to your control or business systems.

What export format do you need?

The standard alarm and event export from your historian or DCS. If you are unsure which one, we will tell you exactly what to pull.

Our DCS is not Experion or DeltaV. Can you still help?

Suppression rules come in native import format for Honeywell Experion and Emerson DeltaV. For any other platform you get the same rules as a structured file with every field your engineers need to enter them, plus the full analysis.

Does this replace a rationalization workshop?

It replaces most of the work. You get the data and the changes up front, so any decisions that still need operations are few and quick to settle.

What do we need to do on our side?

Pull the export, review the package with your engineers, and implement through your normal MOC process.

Start with the baseline assessment.

Tell us your site, DCS platform and roughly how many tags. We reply the same day, seven days a week, with a scope and a secure upload link.