FoxALM alarm management for high-consequence operationsFoxALM alarm management

Three to twelve months of alarm data in. A change package back in five business days.

We turn your historian export into DCS-ready suppression rules, PID retuning parameters and an ISA-18.2 KPI audit. Every finding arrives with the evidence behind it, so your engineers can check the work instead of trusting it.

DCS-ready suppression rules, PID retuning parameters and an ISA-18.2 KPI audit, each with the evidence behind it.

No network access to your systems. No site visit for the baseline assessment.

Alarm rate, before and afterISA-18.2 flood thresholdManageable targetFlood traced to its first alarmISA-18.2 flood threshold
BeforeAfter the change packageAfter

How an engagement works

Three steps. You do the first one, and it takes an afternoon.

  1. Step 1, your team

    You export your alarm history

    Three to twelve months of alarm and event data as a standard export from PI, DeltaV, Experion or equivalent. You send it through our access-controlled client files area. We never connect to your systems.

    Three to twelve months from PI, DeltaV, Experion or equivalent, sent through our client files area. We never connect to your systems.

  2. Step 2, FoxIQ

    We analyse every alarm

    More than 25 independent analytical methods trace floods to their first alarm, separate chattering caused by tuning from chattering caused by the instrument, and measure every ISA-18.2 KPI.

    Floods traced to their first alarm, chattering separated by cause, every ISA-18.2 KPI measured.

  3. Step 3, within five business days

    You receive a change package

    Suppression rules in your DCS vendor’s native import format, PID parameters ready for faceplate entry, and the KPI audit. Each recommendation carries its evidence and a confidence measure.

    Suppression rules in your DCS import format, PID parameters and the KPI audit, each with its evidence.

Field-proven

Proven on real offshore oil wells.

We ran FoxALM end-to-end on sensor data from offshore oil wells, one sample per second, with every event labelled by experts. All ten event classes. Every check written from those labels before the first run. Every one passed.

Read the field validation
42 / 42checks passed
10well event classes
30end-to-end runs
Offshore oil wells operated by a major oil company, offshore Brazil.

What lands on your desk

Three reports written for three audiences, plus the files your engineers implement from. Not a report to file: changes to review, approve and put through MOC.

Excerpts from a FoxALM test run

KPI audit against ISA-18.2 §16.4

MetricISA-18.2 targetResult
Mean alarm rate per operator≤ 6 / h1.5 / h
Peak alarms in any 10 min≤ 1012
Flood eventsMinimise4
Chattering tags02
Standing alarmsFew, reviewed3

suppression_rules.csv

root      FIC-901  cooling water flow low
suppress  P-401    bottoms pump vibration high
basis     When the root is active, downstream
          alarms are consequences. The root
          alarm covers the hazard state.

pid_tuning_recommendations.csv

tag   FIC-301
Kp    -0.315     Ti  1338 s   Td  207 s
gain margin 3.52   phase margin 59.1°   stable

Every run also writes a manifest: fingerprints of the files you sent, the exact pipeline version, and every output produced. Anyone can check that a result came from your data and reproduce it.

Compared with a traditional rationalization workshop

Traditional workshopFoxALM
Time to first resultsThree to six months to mobilise, facilitate and documentFive business days from your export
Your people on siteWeeks of facilitated sessions with operations and engineeringNone for the baseline assessment
What you receiveA rationalization reportA change package in your DCS vendor’s import format
Proof it workedNot usually part of the scopeBefore and after statistical comparison, included

Built for high-consequence operations

Process industries where alarm system failure has a measurable cost.

PLC code review

Code, narratives, cause-and-effect matrix and as-configured controller, checked against each other. Every mismatch shown, interlocks verified, logic proven efficient and correct scan by scan.

About PLC code review

L5 Studio

Our own development environment for Rockwell Logix projects. We use it on every code review and standardization job: whole projects read and written losslessly, ladder and Structured Text in full.

About L5 Studio

Insights

All insights
FoxIQ ResearchWhat the published papers don’t tell you.We re-run the methods in published alarm-management research on real plant data, then publish what it takes to reproduce them, what they assume, and where they break.
About our research

Send us your historian export. We'll show you what's in it.

Tell us your site, DCS platform and roughly how many tags. We reply the same day, seven days a week, with a scope and a secure upload link.